Application / Market:

Corrugated Metal Decking

 

With developable lots at a premium in many markets, increased density has become a consideration for many builders. Light gage steel building enables structures to be built higher than wood frame structures, while retaining many of its advantages. Poured gypsum underlayments are an ideal complement to those structures.

 

Featured Product

 

Corrugated Metal Decking Product Benefits

Fire Rated
Fire-Rated

FIRM-FILL CMD has one and two-hour Fire-Ratings for use over steel joists in conjunction with corrugated metal decking.
Get more info →

Lightweight
Lightweight

FIRM-FILL CMD is Lightweight and reduces the dead load on the building by 55% when compared to three inches of traditional concrete.
Get more info →

uick Drying
Quick Drying

FIRM-FILL CMD is Quick Drying. Our floors set in 90 minutes. Construction traffic can proceed the next day. Ultimate strengths are achieved in 10-14 days when the building is properly ventilated.
Get more info →

High Strength
High Strength

FIRM-FILL CMD is High Strength. With a minimum compressive strength of 3500 psi when tested according to ASTM C472, FIRM-FILL CMD is harder than most traditional concrete floors.
Get more info →

 

Featured Application