FIRM-FILL® High Strength
Structures with cracked or damaged concrete are ideal candidates for an installation of FIRM-FILL® High Strength. FIRM-FILL® High Strength has resurfaced problem concrete in office buildings, universities, retail stores and many other structures across the nation. FIRM-FILL® High Strength has also revitalized the old concrete in notable buildings such as the University of Niagara in New York and re-surfaced the concrete in new construction like the Reagan Presidential Library in Simi Valley, California.
|
| Contractor: |
Talcott Construction, Inc. |
| Project: |
Rainbow Hotel Retirement Home |
| Location: |
Great Falls, Montana |
| Description: |
37,000 sq. ft. level-up, FIRM-FILL® High Strength at 3-1/2"over concrete |
| Date Poured: |
1998 |
|
| Contractor: |
Whiteco Construction |
| Project: |
Marriott Hotel |
| Location: |
Austin, Texas |
| Description: |
79,000 sq. ft. of FIRM-FILL® High Strength at 1/2" on 3rd, 4th & 5th floors of hotel |
| Date Poured: |
2000 |
|
| Contractor: |
DWC Construction Company, Inc. |
| Project: |
Airways Plaza |
| Location: |
Nashville, Tennessee |
| Description: |
118,858 sq. ft. of FIRM-FILL® High Strength at 0" to 4-1/2" over existing concrete slab |
| Date Poured: |
1996 |
|
| Contractor: |
Ninteman (The Sundt Companies, Inc.) |
| Project: |
Scripps Hospital |
| Location: |
La Jolla, California |
| Description: |
73,510 sq. ft. of FIRM-FILL® High Strength poured at 1-1/2" over interior subfloors |
| Date Poured: |
2001 |
|
| Contractor: |
A.D.P. Marshall/ Fluor Daniel Co. |
| Project: |
Riverside |
| Location: |
Newton, Massachusetts |
| Description: |
260,000 sq. ft. of FIRM-FILL® High Strength poured at 1" inch thickness |
| Date Poured: |
2000 |
|
| Contractor: |
Turner Construction Company |
| Project: |
University of Niagara |
| Location: |
Niagara Falls, New York |
| Description: |
33,000 sq. ft. of FIRM-FILL® High Strength from 1" to 3-1/2" floor leveling |
| Date Poured: |
2001 |
|
| Contractor: |
E E Austin & Sons Inc. |
| Project: |
St. Mary’s Home of Erie |
| Location: |
Erie, Pennsylvania |
| Description: |
48,000 sq. ft. of FIRM-FILL® High Strength poured at 1/2" over precast concrete plank |
| Date Poured: |
2001 |
|
| Contractor: |
Joel Kranich Architect, PC |
| Project: |
Cigar Factory Loft |
| Location: |
Pittsburgh, Pennsylvania |
| Description: |
11,000 sq. ft. of FIRM-FILL® High Strength poured from 1" to 8-1/2" on each of 6 floors in post and beam frame |
| Date Poured: |
1999 |
|
| Contractor: |
Oltmans Construction Company |
| Project: |
Palm Terrace Project |
| Location: |
Lake Forest, California |
| Description: |
76,000 sq. ft. of FIRM-FILL® High Strength poured at 1" over second story subfloor |
| Date Poured: |
2001 |
|
| Contractor: |
C. Young & Company |
| Project: |
Ross Dress for Less |
| Location: |
Midland, Texas |
| Description: |
13,000 sq. ft. of FIRM-FILL® High Strength at 1/2" to 3" over existing concrete slab |
| Date Poured: |
2000 |
|
| Contractor: |
Progressive Constructors |
| Project: |
Old Fine Arts |
| Location: |
Murray, Kentucky |
| Description: |
34,125 sq. ft. of FIRM-FILL® High Strength at 1/2" to 3" over existing concrete slab |
| Date Poured: |
1996 |
|
| Contractor: |
The White Company Inc. |
| Project: |
Tenderfoot Employee Housing |
| Location: |
Keystone, Colorado |
| Description: |
52,000 sq. ft. of FIRM-FILL® High Strength |
| Date Poured: |
2000 |
|
| Contractor: |
Carlstrom |
| Project: |
Bethany Assisted Living |
| Location: |
Minong, Wisconsin |
| Description: |
6,992 sq. ft. of FIRM-FILL® High Strength |
| Date Poured: |
2000 |
|
| Contractor: |
Austin Commercial |
| Project: |
Southern Methodist University, Meadows Museum |
| Location: |
Dallas, Texas |
| Description: |
10,000 sq. ft. of FIRM-FILL® High Strength, commercial level-up |
| Date Poured: |
2000 |
|
| Contractor: |
Morcon |
| Project: |
Grand Hotel |
| Location: |
Minneapolis, Minnesota |
| Description: |
19,069 sq. ft. of FIRM-FILL® High Strength poured at 3/4" to 4" on 12th, 13th and 14th floors |
| Date Poured: |
2000 |
|
| Contractor: |
Winter Construction Company |
| Project: |
Dux Hardware Carriage House |
| Location: |
Atlanta, Georgia |
| Description: |
16,000 sq. ft. of FIRM-FILL® High Strength at 1-1/4" over geo-technical fill |
| Date Poured: |
1999 |
|
FIRM-FILL® High Strength:
Recommended Specifications |
Project References