FIRM-FILL® 4010
For projects requiring the highest strength, FIRM-FILL® 4010 is the answer. Designed for thin capping of concrete in new construction or over existing, damaged concrete in renovation or repair projects, FIRM-FILL® 4010 creates an exceptionally hard, flat surface ready for the installation of finished floor coverings. When used over precast concrete plank, it acts as a fire and heat retardant over the joints while smoothing them. FIRM-FILL® 4010 has provided the solution for structures such as the U.S. Post Office in Cambridge, Massachusetts and the Jefferson Street Jail in Atlanta, Georgia.
|
| Contractor: |
Hand Construction, Inc. |
| Project: |
Timbers of Terrell (Bldg. #1) |
| Location: |
Terrell, Texas |
| Description: |
10,000 sq. ft. of FIRM-FILL® 4010 at 3/8" over slab badly damaged by fire |
| Date Poured: |
1998 |
|
| Contractor: |
Hamann |
| Project: |
Inn On Woodlake |
| Location: |
Kohler, Wisconsin |
| Description: |
20,000 sq. ft. of FIRM-FILL® 4010 at 3/4" over span-crete |
| Date Poured: |
1999 |
|
| Contractor: |
NDC Builders, LLC |
| Project: |
Rebecca Residence in West Deer |
| Location: |
Allison Park, Pennsylvania |
| Description: |
49,000 sq. ft. of FIRM-FILL® 4010 poured at 1/2" over precast concrete plank |
| Date Poured: |
1999 |
|
| Contractor: |
PCL Constructors Canada Inc. |
| Project: |
Canada-U.S. Border Crossing Facility-Travellers Building |
| Location: |
Emerson, Manitoba, Canada |
| Description: |
10,258 sq. ft. of FIRM-FILL® 4010 at 1/2" to 2-1/2" over precast plank |
| Date Poured: |
1999 |
|
| Contractor: |
Prime Contractors, Inc. |
| Project: |
Jefferson Street Jail |
| Location: |
Atlanta, Georgia |
| Description: |
16,961 sq. ft. of FIRM-FILL® 4010 poured at 1-1/2" over concrete slab |
| Date Poured: |
1999 |
|
| Contractor: |
Joseph A. Natoli Construction Corporation |
| Project: |
Franciscan Oaks, Fairlawn Building |
| Location: |
Denville, New Jersey |
| Description: |
79,600 sq. ft. of FIRM-FILL® 4010 over concrete |
| Date Poured: |
1999 |
|
| Contractor: |
OPPD |
| Project: |
Omaha Public Power District |
| Location: |
Omaha, Nebraska |
| Description: |
300 sq. ft. of FIRM-FILL® 4010 over existing concrete |
| Date Poured: |
1998 |
|
| Contractor: |
Murlganti |
| Project: |
U.S. Post Office |
| Location: |
Cambridge, Massachusetts |
| Description: |
7,500 sq. ft. of FIRM-FILL® 4010 poured at 1" thickness |
| Date Poured: |
2000 |
|
| Contractor: |
NDC Builders LLC |
| Project: |
Asbury Villas |
| Location: |
Mt. Lebanon, Pennsylvania |
| Description: |
50,000 sq. ft. of FIRM-FILL® 4010 poured over precast concrete plank at 1/2" |
| Date Poured: |
2001 |
|
| Contractor: |
Hoffman Corporation |
| Project: |
Hoffman Corporation Home Office |
| Location: |
Greenville, Wisconsin |
| Description: |
18,000 sq. ft. of FIRM-FILL® 4010 poured at 1-1/2" over concrete |
| Date Poured: |
1999 |
|
| Contractor: |
Healy Construction |
| Project: |
Northfield Resource Center |
| Location: |
Northfield, Minnesota |
| Description: |
10,000 sq. ft. of FIRM-FILL® 4010 |
| Date Poured: |
2000 |
|
| Contractor: |
AP Wisconsin |
| Project: |
Onieda County Courthouse |
| Location: |
Rhinelander, Wisconsin |
| Description: |
12,871 sq. ft. of FIRM-FILL® 4010 poured at 1" |
| Date Poured: |
1999 |
|
| Contractor: |
Hoffman Corporation |
| Project: |
Renaissance Project |
| Location: |
De Pere, Wisconsin |
| Description: |
13,000 sq. ft. of FIRM-FILL® 4010 at 1" over concrete |
| Date Poured: |
1999 and 2001 |
|
| Contractor: |
Providence Contractors, LLC |
| Project: |
J. Jill Retail Store |
| Location: |
Atlanta, Georgia |
| Description: |
3,657 sq. ft. of FIRM-FILL® 4010 poured at 2" over 2nd level concrete floor |
| Date Poured: |
2000 |
|
| Contractor: |
Mark Borough Properties, Inc. |
| Project: |
St. Vital Shopping Center |
| Location: |
Winnipeg, Canada |
| Description: |
6,800 sq. ft. of FIRM-FILL® 4010 over concrete |
| Date Poured: |
1995 |
|
| Contractor: |
Beers Construction |
| Project: |
Sumter Regional Hospital |
| Location: |
Americus, Georgia |
| Description: |
7,754 sq. ft. of FIRM-FILL® 4010 poured 3/4" to feather edge over concrete |
| Date Poured: |
1999 |
|
| Contractor: |
Ayars and Ayars, Inc. |
| Project: |
South Town Chrysler |
| Location: |
Indianola, Iowa |
| Description: |
5,500 sq. ft. of FIRM-FILL® 4010 to level concrete floor in showroom |
| Date Poured: |
2001 |
|
| Contractor: |
NDC Builders, LLC |
| Project: |
Masonic Village at Sewickley |
| Location: |
Sewickley, Pennslyvania |
| Description: |
58,000 sq. ft. of FIRM-FILL® 4010 poured at 3/4" over plank floor surfaces |
| Date Poured: |
2001 |
|
| Contractor: |
Stevenson Builders |
| Project: |
Quail Hill Farm |
| Location: |
Bell Pike, Blue Bell, Pennsylvania |
| Description: |
3,000 sq. ft. of FIRM-FILL® 4010 over concrete |
| Date Poured: |
1999 |
|
| Contractor: |
Berschauer Phillips Construction |
| Project: |
OB 2 Access and Improvements |
| Location: |
Olympia, Washington |
| Description: |
1,500 sq. ft. of FIRM-FILL® 4010 leveling uneven concrete |
| Date Poured: |
1999 |
|
| Contractor: |
Hoffman Corporation |
| Project: |
Renaissance Project |
| Location: |
Wisconsin Rapids, Wisconsin |
| Description: |
12,000 sq. ft. of FIRM-FILL® 4010 poured at 1-1/2" over concrete |
| Date Poured: |
1999 and 2001 |
|
FIRM-FILL® 4010:
Recommended Specifications |
Project References
Back to the top |
Back to the home page
|